Remodel Update

6/12/2017

Remodel completion targeted for July 24th, 2017. The completion date has been exteded a week so trades don't get covered up when new ceiling grid and 2x2 tiles are installed. Minor punch list items will follow before actives move in.

  • Upstairs restrooms will be re-tiled in about a week.
  • Floors in toliet areas tiled last week
  • Patching/re-texturing/painting is currently in full swing (floors 2 and 3 will be completed first.
  • Roof repairs will be addressed this week (thanks Scott Collins)
  • New, Marvin Integrity windows will be installed this and next week.
  • New bedroom furniture delivery/setup will take place in August.
  • We're buying new game room (former living room) and exercise room (former pool table room) equipment in July.
  • New fire alarms system and expansion of the CCTV system are planned to make the house safer. The new XL full-sized beds in bedrooms will come with the new California fire rating for extra safety as well.
  • All bedroom doors are being installed with programmable Schlage door locks.

 

A very grateful thank you to Brother Talkington for keeping us informed.